Apr. 30, 2017 – gravel, boulders & solar

Hier geht’s zur deutschen Version

IMG_0003
overlooking work

The past week just flew by and we were busy getting things done so that we can finally start to bring down the logs to the building site.

But that does imply getting some gravel on the driveway down there…….as moving the old crane in the mud wasn’t possible.

IMG_0386
and getting dirty

So Frank’s boss Justin from Shore Cycle came to our rescue and borrowed us his dump trailer and we were able to move enough gravel from the pit up to our place to make it a nice drive for the crane.

We never lack of rocks and boulders around here………but after dumping all the additional gravel …..looking around it seemed like we’d be living on the moon !

This slideshow requires JavaScript.

While spreading it we also decided to “uncover” one big boulder that we hadn’t been able to remove when we landscaped the place as it was too big and would have had to been blasted. So we thought we’d leave it as is and make it a turning point in our driveway.

When the septic tanks were put in all the dirt and rocks were just piled on top of that boulder to safe some time………well saving time at one point usually backfires later….

As the drainage and the French culvert pass by that now big pile of dirt, we had to clean up there first before putting on the gravel path, as otherwise later on the dirt would later eventually clog up the culvert and we’d have all the dirt on the gravel……..so cleaning up the rock was first priority.

The backhoe is great but not ideal for scraping off dirt from an uneven surface………so shoveling and digging it was again …….but we did do another investment in a gas pressure washer as we’d need that anyhow at some time…….and look for yourself…………that rock is really going to be a eye catcher one day when you drive up to the house.

This slideshow requires JavaScript.

After cleaning that and graveling the path for the crane…..Frank fired it up and down it went……there’s not too much of a slope………but without working brakes…..it even kept Frank breaking into sweat sometimes……how did he manage to brake ?!?!  Just slamming in the reverse every time………..it’s the result that matters, right 😉

Error
This video doesn’t exist
Error
This video doesn’t exist
Error
This video doesn’t exist

But now it’s down there and waiting for logs 🙂

We also set up the boards on top of the foundation. They’re pressure treated and will prevent the moisture of the concrete foundation to get into the logs.

This slideshow requires JavaScript.

We additionally painted tar on the flat side of the sill logs to be 100 % sure that they’ll not soak up any moisture. Frank had talked to a professional log home builder about that and he admitted that he had never even thought about doing that and would  consider it for the future.

After that we had to build up a little structure to move the logs on to to be able to cut the saddle notches and for all that the backhoe really comes in handy.

This slideshow requires JavaScript.

Error
This video doesn’t exist

Our engineer insisted on having metal bars in the foundation to fix the logs in place as soon as they’re set (usually not necessary as the corners of the logs interlock and the logs can’t move anywhere anyhow….but ….. if that’s what they want…) we first drilled in the holes and after that Frank did some measuring and cut in the saddle notches (that’s where the logs will interlock and create the corner).

That will be the only metal we’ll have in the logs……….the rebar he insisted on having going through all of the logs to make sure that they’ll not shift (which must be a new restriction as a couple of years ago the same engineer made the drawing for a two story log home without one rebar stick ) was changed to putting in wooden sticks instead, as we don’t want to have any metal in our logs.

We just a new airing of “Timber Kings” and there they too had to put in rebar but that was for a construction on Vancouver Island which has earth quake building restrictions….so we’re gonna have an earth quake safe building……..you never know what it’s good for 😉

This slideshow requires JavaScript.

Error
This video doesn’t exist
Error
This video doesn’t exist
Error
This video doesn’t exist
Error
This video doesn’t exist

Frank also set up the last solar panels………and know all 20 are up and running. But we did decide to get 10 more just to be on the safe side as we’re getting more and more appliances that will require power and we want to be able to have enough for at least three days if the sun doesn’t shine.

IMG_0005

And at the moment we think 30 panels (260 W each)  should do that without any problem.

Some people think that that is a lot………..but we decided to go with conventional appliances……no fancy things especially for off-grid living…..reason:

We looked at a 16 cu ft. fridge from an off-grid specialized company which run’s on solar……..the fridge costs almost 3000 $ incl. tax……………for the money we can get 10 panels and those will provide more than enough power for a conventional 18 cu ft. fridge and produce even more energy for the batteries and other appliances additionally.

A friend of ours has one of those special fridges. It’s 5 years old had cost almost that money and now something broke and he got it repaired……900 $ as it was special parts only for solar fridges…….

Well……of course it’s everybody’s own decision………but for us……we rather like to have more panels.

Oh…..and we put in a door in the shed…….and’ll be working on separating a little room for me as a workshop so I can finally start on doing some crafts, candle- and soap making……what was it…..”Happy wife, happy life? ” 🙂

Weather is great today……….so I’d better get out an help Frank bring down the first log……..I’ll keep you posted …

Have a great day and don’t forget……life’s too short to waste a minute 🙂



Deutsche Version

IMG_0003
overlooking work

Die letzte Woche ist im Flug vergangen und wir waren fast die ganze Zeit damit beschaeftigt, alles soweit vorzubereiten, damit wir endlich unsere Baumstaemme nach unten bringen koennen.

IMG_0386
and getting dirty

Das bedeutet aber, dass erstmal der Teil der Zufahrt befestigt werden musste, denn den alten Kran durch den Schlamm zu fahren, war nicht moeglich.

Franks Boss Justin von Shore Cycle kam dann wieder als Retter in der Not und borgte uns seinen Kipphaenger, damit wir Kies von der Kiesgruebe zu uns hochbringen konnten.

Wir haben ja eh schon keinen Mangel an Steinen und Felsen…..aber nachdem wir das alles noch dazu abgekippt hatten………..da sah es aus wie auf’m Mond !

This slideshow requires JavaScript.

Waehrend wir also am Kies verteilen waren, haben wir uns auch entschlossen, den grossen Felsen, der mitten in der Einfahrt steht freizulegen.

Den hatten wir damals stehenlassen, da er so gross ist, dass er haette gesprengt werden muessen und da dachten wir uns, dass es vlt. ein netter Hingucker waere, wenn man spaeter auf das Haus zugefahren kommt und der dann einen Wendepunkt dort darstellt.

Naja, als das Loch fuer die Abwassertanks gegraben wurde, hatte man der Einfachheithalber den ganzen Dreck und das Geroell auf den Felsen gekippt………..womit wir nun dasassen und das ganze Zeug entfernen mussten, denn unser frisch angelegter Steinabflussgraben liegt genau daneben und wenn wir den Felsen spaeter freilegen, wird alles in die Steine gespuelt und verstopft evt. den Graben und dem neuen Kiesweg tut das auch nicht gut……also erstmal Prioritaeten verschieben und saubermachen.

Der Bagger ist ja wirklich toll…..aber nicht ideal um Dreck von einer unebenen Oberflaeche abzukraten…also war mal wieder Handarbeit angesagt. Wir hatten uns aber vorher einen Benzinhochdruckreiniger besorgt, den wir eh immer mal brauchen werden und der sich als gute Investition dargestellt hat………..denn der Felsen wird definitiv ein Hingucker wenn man zum Haus hochfaehrt

This slideshow requires JavaScript.

Nachdem wir alles saubergemacht und Kies gelegt hatten, war der Pfad fuer den Kran fertig und Frank hat ihn angeschmissen und ab ging’s…….es geht nicht wirklich steil runter……aber ohne funktionierende Bremsen, hatte sogar Frank ein paar Schweissperlen auf der Stirn…….wie er gebremst hat…..”einfach” immer nur den Rueckwaertsgang einwerfen …… der Zweck heiligt die Mittel 😉

This slideshow requires JavaScript.

Error
This video doesn’t exist
Error
This video doesn’t exist
Error
This video doesn’t exist

Aber nun steht er und wartet auf die Staemme 🙂

Wir haben auch impraegnierte Bretter auf das Fundament getan, wo die Staemme dann raufkommen, damit keine Feuchtigkeit vom Zement in den Stamm kommen kann.

This slideshow requires JavaScript.

Zusaetzlich haben wir noch auf die flache Unterseite Teer gestrichen, um 100%ig sicher zu sein, dass von unten kein Rotten aufgrund von Wasser entstehen kann. Frank hatte auch mit einem Bekannten gesprochen, der professionell Blockhaeuser baut und der meinte, dass er darueber noch nie nachgedacht haette und das fuer sich in Zukunft auch vornehmen wuerde.
Danach haben wir dann noch ein kleines Gestell gebaut, wo die Staemme rauf kommen, damit man besser die “Saddle Notches” schneiden kann und um die dorthin zu bekommen, bewaehrt sich wieder der Bagger.

This slideshow requires JavaScript.

Error
This video doesn’t exist

Unser Ingenieur bestand darauf, Bewehrungstaebe ins Fundament zu giessen, um die Staemme zu fixieren (normalerweise nicht noetig, denn aufgrund der “Saddle Notches” koennen die uebereinander liegenden Staemme sich nicht bewegen….aber, wenn das sein Wunsch ist ), also muessen wir auch noch vorher Loecher in die Staemme bohren, wo dann die Staebe durchgehen und natuerlich mussten die “Satteltaschen” angezeichnet und geschnitten werden.

Das ist aber das Einzige Metall, das wir in der Konstruktion haben werden ! Der Ingenieur bestand eigentlich auch noch darauf, dass Bewehrungsstaebe zwischen saemliche Baumstaemme, als Verfestigung durchgehen, damit sie sich nicht verschieben.

Muss eine neue Vorschrift sein, denn als Frank vor ein paar Jahren in dem Blockhausbetrieb gearbeitet hatte, hat derselbe Ingenieur keine Staebe verlangt, obwohl es sogar ein zweistoeckiges Haus war, an dem sie gearbeitet hatten.  Aber, Frank konnte ihn davon ueberzeugen, dass es genauso gut geht, wenn man stattdessen Holzstangen einarbeitet……….ist zwar’ne Mordsmehrarbeit, aber, Frank moechte es gern so……..naja, und dann wird es auch so gemacht 😉

Wir hatten auch gerade eine neue Folge der Serie “Timber Kings” gesehen……..da mussten die auch Bewehrungsstaebe einsetzen, aber nur, weil das Haus auf Vancouver Island gebaut wurde…und die Gegend dort gilt als Erdbebengebiet und daher die Vorschrift………wir werden also ein erdbebensicheres Haus haben ……….man weiss ja nie, wozu’s mal gut sein kann 😉

This slideshow requires JavaScript.

Ansonsten hat Frank die letzten Solarpanele raufgesetzt …und nun sind alle 20 drauf und arbeiten super!

Wir haben uns aber entschlossen, noch 10 mehr zu besorgen, da wir ja auch immer mehr Verbraucher anschaffen werden und wir sicher sein wollen, auch wenn die Sonne mal drei Tage nicht scheint, dass wir den Generator nicht anwerfen muessen.

Wir hoffen, dass fuer alles spaeter dann 30 Panele a 260 W reichen werden, um diese problemlos zu betreiben.

Viele Leute sagen uns, dass das viel ist, aber, wir haben uns entschlossen verbrauchsfreundliche, aber handelsuebliche Geraete anzuschaffen und keine, speziell fuer das “off-grid” Leben produzierten.

Wir haben entsprechende Vergleiche angestellt und festgestellt, dass wir allein fuer einen solarbetriebenen Kuehlschrank ueber 2000 $ mehr zahlen muessen, als fuer einen handelsueblichen mit nicht viel mehr Grundverbrauch…………..dafuer bekommen wir fast 20 Solarpanele, die so viel Energie produzieren, dass wir nicht nur den Kuehlschrank, sondern auch viele andere Geraete mit betreiben koennen.

Noch ein Grund……….ein Bekannter von uns hat so einen Kuehlschrank…..nach 5 Jahren war nun einen Reparatur faellig……bei diesem Kuehlschrank war spezielles Kompressorteil fuer Solarkuehlschraenke………900 $ nur fuer das E-Teil ……dafuer bekomme ich locker einen nagelneuen Kuehlschrank !!

Aber, was man fuer Richtig haelt, das ist natuerlich wirklich Jedermann’s eigene Entscheidung !!

IMG_0005

Ach ja, und zu guter Letzt ……Frank hat angefangen eine richtige Tuer in den grossen Schuppen zu bauen und einen Bereich abzustecken, der dann bald Waende bekommt und zwei schoene Fenster , wo ich dann meine eigene, kleine Werkstatt habe und  ich endlich wieder ein paar Holzarbeiten, Seife und Kerzen machen kann……da freue ich mich schon sehr drauf………und Frank ist ja nicht bloed…..”happy wife, happy life” 🙂

So, Wetter ist heute super und ich werd mal raus und Frank helfen, die ersten Staemme aufzulegen !!! Ich halte Euch auf dem Laufenden, wie’s klappt !!

Bis dahin, tschuess……habt einen tollen Tag und geniesst das Leben, denn:

life’s too short to waste a minute 

Apr. 22. 2017

Hier geht’s zur deutschen Version

Here we are again………back to the seasonal single digit temperatures and the occasional flurries 🙂

But nevertheless we’ve made some progress with our ditches and filling up the driveway down to the “house”  so that at least now we’ll soon be able to drive down the old crane beside the foundation without having to fear that it’ll sink down into the mud and we’ll not be able to move it then anymore.

This slideshow requires JavaScript.

But first some minor repairs on the backhoe had to be made.

As when Frank was spreading the gravel from left to right with the small bucket he noticed that it had tilted to one side and after looking what was going on he saw that the pin locking the bucket in place had ripped off and the rod holding it had already slipped out a bit and one more swing and Frank would have probably lost the whole bucket.

So we had to take an unintended brake and make a temporary fix until we get a new pin……so Frank decided to weld it tight.

This slideshow requires JavaScript.

It was also a good chance to see how much power the welder would really need and if the converters 5000 W would be enough.

If you’re interested here are  two short videos where you can see that the converter is almost maxed out and that’s something we actually don’t want so in future we’ll probably rather use the generator.

Error
This video doesn’t exist
Error
This video doesn’t exist

But the solar system had enough power and from welder to TV or fridge……we didn’t have to use the generator at all and we don’t even have all panels up yet.

I moved back to the camper too a couple of days ago and with temperatures down again Frank borrowed an electric baseboard heater from our friend Uli and installed it in the bedroom on the sideboard and now it’s enough to fill up the woodstove in the living room in the evening and with the heater on in the bedroom it’s warm enough that I don’t have to get up at night anymore. I love it !!

IMG_3013

Last week we also got a call from a neighbor close by who knows that we’re always looking for crooked trees ……and as he’s into cutting trees and making firewood he comes across some really nice one’s which are useless for him as they don’t fit in his machine but for us a dream come true.

So he kept two really nice and big ones and also some hollow one’s I can use for my crafts.

They are so big and heavy that we had to take the backhoe to lift them and although one unfortunately split when it was cut and came down, I really think we’re going to able to create a really nice bench or two of it.

This slideshow requires JavaScript.

As the big one’s were just cut they had to be peeled quickly before the bugs get in and as they are so crooked and have a lot of knotholes they have to be peeled by hand…..and I have my own way of doing that 😉

Here some links to a couple of short videos about that…..and of course in the end Frank comes and I look like an idiot………but see for yourself 😉

Error
This video doesn’t exist
Error
This video doesn’t exist
Error
This video doesn’t exist
Error
This video doesn’t exist
Error
This video doesn’t exist

I also made a short one about the “layers” a tree  has…maybe you haven’t noticed that before:

Error
This video doesn’t exist

And here some photos in case you’d like to see here first……..although none of the “screwdriver peeling” 😉

This slideshow requires JavaScript.

Well and what’s gonna be next …..as soon as all the gravel has been spread we’ll move the crane down and keep on digging ditches and filling them with rocks and trying to improve the driveway as soon as it’s dry.

This slideshow requires JavaScript.

Last but not least something I really had to take a picture of and I’m not sure there are too many people out there who’d think that marketing wise it would be smart to choose a name like that for your food truck……..but really they have awesome fish’n chips ………and the name just always makes me smile 🙂

IMG_2972

Oh, and I just found out that Mark Twain really is a great source for wonderful quotes ……..so I’ll throw in some once in a while……….take care  and :

Mark twain best famous quotes images pics (1)


Deutsche Version

Und wieder zurueck auf Anfang…..Tagestemperaturen im einstelligen Bereich und hin und wieder ein wenig Schnee !

Aber, nichts desto trotz machen wir Fortschritte mit unseren Graeben und der Zufahrt  zum “Haus” und so werden wir wenigstens bald in der Lage sein, den alten Kran runter neben das Fundament zu fahren, ohne befuerchten zu muessen, dass er bis zur Achse im Schlamm steckenbleibt

This slideshow requires JavaScript.

Erstmal mussten aber ein paar kleine Reparaturen am Bagger vorgenommen werden.

Denn als Frank mit der kleinen, vorderen Schauffel den Kies von links nach rechts verteilte, sah er, dass die Schauffel schief hing. Als er stoppte, sah er, dass der Sicherungsring fehlte und der Bolzen, der die Schauffel haelt, sich bereits aus der ersten Verankerung geloest hatte…..ein paar Schwuenge mehr und die Schauffel waer weg gewesen.

So musste dann eine Zwangspause eingelegt werden, um das ganze erstmal provisorisch zu reparieren und auf die Schnelle ging das nur mit festschweissen.

This slideshow requires JavaScript.

Es war auch gleich eine gute Gelegenheit zu sehen, wie viel Strom das Schweissgeraet nun wirklich zieht und ob die 5000 W des Konverters dafuer ausreichen wuerden.

Falls es Euch interessieren sollte, hier zwei kurze Videos, wo man sehen kann, dass der Konverter an seine Belastungsgrenze geht.

Error
This video doesn’t exist
Error
This video doesn’t exist

Das wollen wir eigentlich nicht und werden in Zukunft fuer solche Einsaetze dann doch lieber unseren Generator einsetzen.

Aber, wir wissen wenigstens, dass das Schweissgeraet problemlos zu betrieben waere und neben allen anderen Verbrauchern die noch so laufen, mussten wir bisher noch kein einziges Mal den Generator anwerfen und das obwohl noch nicht einmal alle Panele bisher montiert sind.

Ich bin nun auch vor ein paar Tagen zurueck in den Camper gezogen  und da die Temperaturen wieder gefallen sind, hat Frank einen Elektroheizkoerper von unserem Freund Uli geborgt bekommen und im Schlafzimmer auf der Anrichte montiert und angeschlossen…..nun reicht es, Abends den Holzofen im Wohnzimmer zu befuellen und mit dem Heizer im Schlafzimmer ist es warm genug, dass ich Nachts nicht mehr aufstehen und nachheizen muss. Ich liebe es !!!

IMG_3013

Letzte Woche haben wir dann noch von einem entfernten Nachbarn einen Anruf bekommen, dass er ein paar grosse, krumme Baeume hat, die er faellen muss und fragte, ob wir an denen Interesse haetten.

Er macht nebenbei Feuerholz und die krummen Dinger passen nicht in seine Maschine……na, und uns muss man nicht zweimal Fragen……solche Staemme zu bekommen ist ein Traum !

Einer ist leider beim Faellen etwas gespalten, aber, da bekommen wir bestimmt trotzdem ein oder vlt. sogar zwei Sitzbaenke raus. Die “vernarbten” und hohlen sind fuer mich……einfach perfekt fuer meine Art der Holzarbeiten.

This slideshow requires JavaScript.

Da die beiden Grossen gerade gefaellt waren, mussten sie so schnell wie moeglich geschaelt werden, da sonst die Kaefer in die noch “saftige” Rinde gehen und da sie so krumm sind und viele Astloecher haben, muessen sie per Hand geschaelt werden und ich hab da so meine eigene Methode ;-)…..aber das nur im Video..

This slideshow requires JavaScript.

Falls Ihr Lust habt, das im Video zu sehen….und natuerlich kommt Frank am Ende mit seiner Idee…..und ich stehe wieder wie doof da…..aber seht selbst 🙂

Error
This video doesn’t exist
Error
This video doesn’t exist
Error
This video doesn’t exist
Error
This video doesn’t exist
Error
This video doesn’t exist

Und hier auch noch ein Kurzes ueber die “Lagen”, die so ein Baum hat…..vlt. habt Ihr sowas ja noch nicht gesehen:

Error
This video doesn’t exist

Nun…..und was sonst noch so bei uns fuer die kommenden Tage ansteht…….sobald der ganze Kies verteilt ist, kommt der Kran als naechstes runter und nebenbei werden weiter Graeben entlang der Zufahrt gezogen und mit Steinen aufgefuellt, wo dann das Wasser gut ablaufen kann und wir dann rangehen koennen und die dann hoffentlich trockene Zufahrt, begradigen und mit Kies belegen koennen.

This slideshow requires JavaScript.

Zum Schluss aber noch ein Foto, das ich einfach aufnehmen musste, denn ich find den Namen von diesem “Foodtruck” einfach zu cool und muss immer lachen, wenn ich ihn sehe………….wenn ich mir auch vom marketingtechnischen Stand her nicht sicher bin, ob das wirklich geschaeftsfoerdernd  ist :-)……aber wir haben schon da gegessen und die Fisch’n Chips sind wirklich gut !!!

IMG_2972

Ich habe uebrigens jetzt erst entdeckt, das Mark Twain eine wirklich gute Quelle fuer tolle “Sprueche” ist, die mir gut gefallen…..werde also mal hin und wieder einen posten……in diesem Sinne….macht’s gut und …..

Mark twain best famous quotes images pics (1)

Apr. 16, 2017 – Easter Sunday

Hier geht’s zur deutschen Version

Happy Easter
Happy Easter from the Easter dog !

Happy Easter to you all…………..and the pictures are proof…..the Easter Bunny is actually an Easter dog 🙂

Hope you’re all spending this day with family and friends and are enjoying a nice day !!

We’ll keep digging to get our drainage’s  hopefully done in a day or two.

First though we had to move the peeled bark…….it was two full trailer loads of that stuff !

IMG_0344IMG_0349

Then we started digging………..and the more we dug the more water and mud appear…….

This slideshow requires JavaScript.

but Frank got a really nice section finished and so we could take the backhoe down to the gravel pit and fill up the trailer with 4 – 10 inch gravel.

This slideshow requires JavaScript.

A friend of our’s who builds road had suggested  after digging the trench we first put in some big gravel and then those pvc pipes with holes in them……that makes the water flow better and additional water can press in through the holes and flow better than just in a French culvert.

Well…..we’ll see.

Unfortunately we couldn’t just dump the rock in the trench as we were a little worried about the pvc pipes make braking and also couldn’t really get to the spot necessary……….so we had to dump everything by hand…..Frank with the shovel and me picking every stone by hand………….sometimes it’s really good you don’t know what to expect when you start a job 😉

This slideshow requires JavaScript.

But we got one load off the trailer and it looks as if it could really be working……well….we’ll see 😉

Frank moved to the trailer two days ago………….and is literally a “happy camper”…..as we also got satellite internet and……tatatata…..satellite TV !!!  After almost two years…..finally TV again …..of course the first things he watched was motorsport 😉

I shuttle up and down to the cabin for now as I still have a lot to pack……..and it’s just more convenient …..and warm at night.

Frank told me that he slept so deep he didn’t wake up at night to put on wood in the woodstove and got up in the morning with only 7 degrees in the camper !

Well….I’ll be there soon enough and take over the woodstove refill night shift 🙂

But I’m sure it’ll not be for long as spring is really in it’s way !

I’ll keep you posted and until then…… have a wonderful Easter Sunday !!

This slideshow requires JavaScript.


Deutsche Version

Happy Easter
Happy Easter from the Easter dog !

Frohe Ostern Euch allen …..und hier der Beweis….der Osterhase ist eigentlich ein “Osterhund” 🙂

Wir hoffen, dass Ihr diesen Tag alle mit Familie und Freunden verbringt und einen schoenen Tag habt !

Wir werden weiter an unseren Wassergraeben arbeiten und in hoffentlich ein bis zwei Tagen fertig sein.

Aber erstmal mussten wir unsere ganze Rinde abfahren…..es waren dann doch zwei ganze Anhaengerladungen voll !

Dann haben wir mit dem Graben angefangen……….und je mehr wir gruben, desto mehr Wasser und Schlamm kam hoch,

This slideshow requires JavaScript.

aber Frank hat es dann doch geschafft eine ganze Strecke zu graben und so konnten wir heute zur Kiesgrube runterfahren und dann mit dem Bagger den Haenger mit 8 – 20 cm grobem Kies beladen.

This slideshow requires JavaScript.

Ein Freund von uns, der Wege baut hatte noch vorgeschlagen, dass wir nach dem Ausheben der Graeben erst den groben Kies und dann PVC Rohre mit Loechern reinlegen und dann weiter aufffuellen. Das Wasser laeuft dann noch besser ab und Wasserdruck von Aussen auf das Rohr wird das Wasser durch die Loecher druecken und zu noch besserem Abfluss fuehren.

Nun ja….wir werden sehen .

Leider konnten wir die Steine nicht einfach abkippen, da wir uns Sorgen machten, dass das evt. die Rohre beschaedigen koennte und ausserdem konnten wir den Haenger eh nicht direkt bis an die noetige Stelle fahren……so wurde das Entladen dann doch wieder Handarbeit……Frank mit der Schauffel und ich, jeden Stein in die Hand nehmend……manchmal ist es wirklich von Vorteil, wenn Du nicht im Vorfeld weisst, was Dich erwartet 😉

This slideshow requires JavaScript.

Aber, wir haben dann alles abgeladen bekommen und die erste Fuhre ist verteilt und es sieht so aus, als koennte es wirklich klappen…..wir werden sehen 😉

Frank ist vor zwei Tagen wieder in der Camper gezogen und ist in seinem Element…..den wir haben nach fast zwei Jahren Abstinenz nun wieder richtiges TV !! Es gibt fuer Fernsehen und dann auch noch Internet jeweils eine Sat-Schuesssel….und der Empfang vom Internet zumindest, ist nicht doll, aber besser als nix und das Erste, was gleich aufgenommen wurde, war natuerlich Motorsport 🙂

Ich fahre noch hoch und runter von unserer Winterunterkunft da noch viel zu packen ist…..und , ich geb’s zu…..es ist nachts ein wenig waermer als im Camper.

Heute frueh erzaehlte mir Frank, dass er morgens nur 7 Grad drinnen hatte…..tja, das hat er davon, wenn er immer so fest schlaeft, dass ihn noch nicht mal der drohende Erfrierungstod wecken wuerde 😉

Naja, ich bin ja bald wieder da und dann wird wieder die “Holzfuellnachtschicht” eingefuehrt…..aber ich glaube nicht fuer lange, denn der Fruehling ist definitive auf dem Vormarsch !!

Ich halte Euch jedenfalls auf dem Laufenden und bis dahin habt erstmal noch einen schoenen Ostersonntag !

This slideshow requires JavaScript.